Resources Optimisation in New Hospital Central Kitchen Design

Team Member
- Dr. Malcolm Low (PI)
- ICT IWSP student: Chan Kian Ann
- Industry Partner(s): Woodlands Health Campus
Project Start & End Date
Channel of Collaboration and/or Funding
- Integrated Work Study Programme (IWSP)
Problem to Solve
- In the new Woodlands Hospital, how should the workflow of the central kitchen be designed so as to maximize its efficiency.
Solution and Notable Contribution
- Develop an automated staff roster planning system that generates staff duty schedule and assigns staff to workstations fairly based on their competency, availability and preference and the business rules of different polyclinics.
Publication
Central Kitchen Process Flow

Central Kitchen Simulation Model
